Uamai Bridge - Papua New Guinea
Bridge Type: Single Lane
All steel UNIBRIDGE® 3 modules (34.20m. long) 1 lane launched in 10 days using only two excavators (no crane available on site).
Even in very challenging and remote areas, like UAMAI in Papua New Guinea, UNIBRIDGE can be installed using only two excavators when cranes or other heavy equipment is not available.