Gold Coast City Council Bridge - Australia
Bridge Type: Single Lane
45.6m one lane Unibridge® to be rolled through Gold Coast City Councils bridge replacement program.
Built on standard abutment designs supplied by Unibridge®, this bridge was used as a temporary crossing while the new permanent bridge was constructed alongside. The Unibridge has since been removed and is being reconfigured as temporary crossings for the remaining bridges in their program.
« Back to case studies map